5  Manufacturing Processes and Production Systems

Week 5 Planned, awaiting draft

ImportantLearning objectives (tentative)

By the end of this week you should be able to:

  1. Classify common manufacturing processes.
  2. Relate WIP, throughput, and flow time with Little’s Law.
NoteComing soon

These lecture notes will be written from the instructor’s Week 5 draft. The topics below are a working outline.

5.1 Planned topics

NoteKey terms in this chapter
  • Additive manufacturing — Building parts layer by layer directly from a digital model; commonly called 3D printing.
  • Automation — Using machines and control systems to perform tasks with reduced human intervention.
  • Capacity — The maximum output a resource or system can produce in a given period under normal conditions.
  • CNC — Computer numerical control; machine tools whose motions are directed by programmed instructions.
  • Little’s Law — The relationship WIP = throughput × flow time, which holds for any stable system over the long run.
  • Subtractive manufacturing — Making parts by removing material from a solid workpiece, as in milling, turning, and drilling.
  • Work-in-process — Inventory that has started production but is not yet finished; often abbreviated WIP.